메뉴 건너뛰기
소속 기관 / 학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
고객센터 ENG
주제분류

논문 기본 정보

저자정보
저널정보
한국에너지기후변화학회 에너지기후변화학회지 에너지기후변화학회지 Vol.1 No.2
오류 신고하기

피인용 0

검색

    초록·키워드

    Domestic wind power CDM project is limited to the mainland so far, and the baseline has been estimated from the same grid network system for the mainland and Jeju island as well. However, the grid electricity of Jeju Island does not come from the mainland but there is just ‘electric power supply’ from the mainland. Therefore, the current baseline system is unreasonable to apply for Jeju wind power CDM projects. In this study, an application plan is prepared and recommended which considers a new baseline reflecting the characteristics of grid electricity system between Jeju Island and the mainland. Also, the proper emission reduction is estimated for Jeju Island CDM projects. In future, it is expected that the proposed methodology be adopted and referred to when considering similar CDM projects in Jeju Island.

    최근 본 자료 전체보기

      UCI(KEPA) : I410-ECN-0101-2013-563-000889682