메뉴 건너뛰기
소속 기관 / 학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
고객센터 ENG
주제분류

논문 기본 정보

저자정보
(University of Bisha)
저널정보
대한산업공학회 Industrial Engineering & Management Systems Industrial Engineering & Management Systems Vol.23 No.3
오류 신고하기

피인용 0

검색

    초록·키워드

    One of the major challenges in manufacturing systems is addressing bottlenecks. Managers and engineers strive to find methods to eliminate bottlenecks and reduce wait times in production lines. In this study, a simulation model of a manufacturing system was analyzed, focusing on bottlenecks and underutilized machinery. Validated simulation inputs were collected to build a model for optimizing the production line. The objective was to simulate the current production line to understand and analyze its bottlenecks and propose improvement solutions. The simulation model was developed using Arena software, revealing several bottleneck stations affecting production line efficiency. A model incorporating different parts of the production line and inventory management of cement was proposed to address this problem. Various improvement steps were analyzed using the simulation model to eliminate bottlenecks and enhance production line performance. As a result, the daily production capacity of the rotary kiln increased from 3699 to 8200 tons, more than doubling the current output.

    최근 본 자료 전체보기

      UCI(KEPA) : I410-151-25-02-090880773