메뉴 건너뛰기
소속 기관 / 학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
고객센터 ENG
주제분류

논문 기본 정보

저자정보
(Gachon Univerity) (Gachon Univerity) (Youngsan University) (Korea Electric Power Corporation) (Gachon University)
저널정보
대한전기학회 전기학회논문지 전기학회논문지 제75권 제10호
오류 신고하기

피인용 0

검색

    초록·키워드

    Virtual power plant (VPP) operators participate in renewable energy bidding markets by forecasting renewable generation and submitting bids based on these forecasts. As allowable forecast-error ranges have recently been tightened to improve the reliability of renewable energy resources, VPP operators face increasing imbalance penalty (IBP) costs. Energy storage systems (ESSs) can mitigate IBP costs by storing surplus generation that is not cleared in the market and selling it later. However, the high upfront cost of ESSs entails considerable financial risk and may create a significant barrier to entry for VPP operators. Therefore, this study evaluates the long-term economic feasibility of an ESS leasing-based business model involving renewable energy generators, an ESS leasing provider, and a VPP operator participating in a renewable energy bidding market. A VPP operating revenue model incorporating metered energy payments, capacity payments, and IBPs was developed, and a one-year operational simulation was conducted. The resulting costs and benefits were subsequently evaluated over the project lifetime.

    최근 본 자료 전체보기