번역 버튼을 눌러보세요!
Scheduling RMGs in a container terminal with determination of the intermediate location of containers
논문 기본 정보
- 저자정보
- 발행연도
- 2010.11
- 수록면
- 393 - 399 (7page)
Scheduling RMGs in a container terminal with determination of the intermediate location of containers
초록·키워드
This paper addresses the problem of scheduling the twin rail-mounted gantry (RMG) cranes used at automated container terminals. We consider this problem in a real-time situation and employ local search-based methods to optimize crane scheduling. The proposed method creates a schedule for the jobs requested within a given fixed-length horizon. To reflect changes in the situation, the method updates the crane schedule by rescheduling at fixed intervals. In the process of searching for the optimal schedule, the proposed method optimizes not just job assignment for each RMG and the sequence of job execution, but also the intermediate locations of containers. A simulation shows that the proposed method outperforms the previous methods it is compared with in terms of the waiting time of both the internal transportation vehicles (i.e. automated guided vehicles) and the external trucks.
본문·목차
인공지능 문자 인식 모델을 통해 추출된 텍스트로, 일부 오타나 오류가 포함될 수 있으나 지속적으로 개선 중입니다.
오류를 발견하셨다면 해당 부분을 드래그한 후 ' 를 통해 신고해주세요.
오류를 발견하셨다면 해당 부분을 드래그한 후 ' 를 통해 신고해주세요.
최근 본 자료 전체보기
UCI(KEPA) : I410-ECN-0101-2013-003-000516947