메뉴 건너뛰기

Backward Pegging을 이용한 반도체 후공정 스케줄링 Semiconductor Backend Scheduling Using the Backward Pegging

논문 기본 정보

저자정보
(아주대학교) (삼성전자) (아주대학교)
저널정보
(사)한국CDE학회 한국CDE학회 논문집 한국CAD/CAM학회 논문집 제19권 제4호
발행연도
수록면
402 - 409 (8page)
오류 신고하기

피인용 3

Backward Pegging을 이용한 반도체 후공정 스케줄링
검색

    초록·키워드

    Presented in this paper is a scheduling method for semiconductor backend process considering the backward pegging. It is known that the pegging for frontend is a process of labeling WIP lots for target order which is specified by due date, quantity, and product specifications including customer information. As a result, it gives the release plan to meet the out target considering current WIP. However, the semiconductor backend process includes the multichip package and test operation for the product bin portion. Therefore, backward pegging method for frontend can’t give the release plan for backend process in semiconductor. In this paper, we suggest backward pegging method considering the characteristics of multichip package and test operation in backend process. And we describe the backward pegging problem using the examples.

    최근 본 자료 전체보기

      UCI(KEPA) : I410-ECN-0101-2016-580-000952950