국내 최초 Industrial IPD(I2PD) 프로젝트 사례분석을 통한 Pre-construction BIM 적용을 위한 성공요소 도출 Case Study on Pre-construction BIM Application of First IPD-based Industrial Plant Project in Korea
논문 기본 정보
- 저자정보
- 발행연도
- 2020.6
- 수록면
- 111 - 122 (12page)
- DOI
- 10.7315/CDE.2020.111
국내 최초 Industrial IPD(I2PD) 프로젝트 사례분석을 통한 Pre-construction BIM 적용을 위한 성공요소 도출
초록·키워드
Recently, the domestic construction industry has been introducing the new delivery systems such as IPD, CM at Risk and Pre-Con. This is delivery method that can further enhance the usability of BIM technologies, enabling direct and effective support of construction management tasks performed during the Pre-construction phase. However, there are no BIM application methods, procedures, or strategies in this delivery system in domestic so far, it remains in limited BIM application, which was used under the existing design-bid-build method. In this research, the case of IPD and BIM applied to industrial plant construction project for the first time in Korea is analyzed and, by doing so, the success factors for BIM application in IPD project are derived. The single case study was used as a research methodology, and the success factors of IPD BIM are derived by conducting face-to-face interviews with key stakeholders who actually participated in the case project.
본문·목차
인공지능 문자 인식 모델을 통해 추출된 텍스트로, 일부 오타나 오류가 포함될 수 있으나 지속적으로 개선 중입니다.
오류를 발견하셨다면 해당 부분을 드래그한 후 ' 를 통해 신고해주세요.
오류를 발견하셨다면 해당 부분을 드래그한 후 ' 를 통해 신고해주세요.
최근 본 자료 전체보기
UCI(KEPA) : I410-ECN-0101-2020-530-000683480