(Department of Civil Engineering, Faculty of Engineering, Chulalongkorn University) (School of Engineering, Griffith University, Gold Coast Campus) (Nottingham Centre for Geomechanics, The University of Nottingham) (School of Engineering, Griffith University, Gold Coast Campus) (School of Engineering, Griffith University, Gold Coast Campus)
저널정보
테크노프레스 Geomechanics & engineering Geomechanics & engineering 제5권 제2호
발행연도
수록면
99 - 118 (20page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
이 논문의 연구방법이 궁금하신가요?
🏆
연구결과
이 논문의 연구결과가 궁금하신가요?
AI에게 요청하기
추천
검색

초록· 키워드

Construction of the extension project of the Bangkok MRT Blue Line underground railway was recently started in 2011. The construction of approximately 5 km long underground tunnel and 4 deep excavations of underground station are considered to be the most important geotechnical works. The pressuremeter was selected as a high-quality in situ testing of the soil to evaluate design parameters for the project. In addition, other field and laboratory tests such as vane shear and $CK_0U$ triaxial tests were included in the investigation programme. This paper aims to present the ground conditions encountered along the MRT Blue Line extension project as well as the site investigation and interpretation techniques with particular focus on the pressuremeter tests. The results are also compared with the pressuremeter investigation from the previous Bangkok MRT project.
상세정보 수정요청해당 페이지 내 제목·저자·목차·페이지
정보가 잘못된 경우 알려주세요!

목차

등록된 정보가 없습니다.

참고문헌

참고문헌 신청

최근 본 자료

전체보기