메뉴 건너뛰기

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
저널정보
대한건축학회 대한건축학회 논문집 - 구조계 대한건축학회논문집 - 구조계 제16권 제3호
발행연도
수록면
77 - 83 (7page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
이 논문의 연구방법이 궁금하신가요?
🏆
연구결과
이 논문의 연구결과가 궁금하신가요?
AI에게 요청하기
추천
검색
질문

초록· 키워드

Cost, time, and quality are the three major measures for the project performance. Among these three measures, cost control directly relates to the profit and competence of a construction company. However, it is conceived that current practice of cost control in major Korean general contractors needs to be improved in terms of its accuracy and procedure. The problems are mainly caused by the shortage of cost engineers on job sites. In this context, the purpose of this study is to identify major factors for improving construction cost control on job sites. A survey was conducted to investigate current cost management systems of 15 Korean general contractors. Barriers and solutions were explored in terms of improvement of cost control process under limited utilization of cost engineers. Findings of this study suggests; 1) Early budgeting, 2) Using higher level of items, 3) Simplifying progress measurement, 4) Systemizing cost forecast, and 5) Effectively utilizing computer systems.
상세정보 수정요청해당 페이지 내 제목·저자·목차·페이지
정보가 잘못된 경우 알려주세요!

목차

등록된 정보가 없습니다.

참고문헌

참고문헌 신청

최근 본 자료

전체보기
UCI(KEPA) : I410-ECN-0101-2009-540-012965959