인문학
사회과학
자연과학
공학
의약학
농수해양학
예술체육학
복합학
지원사업
학술연구/단체지원/교육 등 연구자 활동을 지속하도록 DBpia가 지원하고 있어요.
커뮤니티
연구자들이 자신의 연구와 전문성을 널리 알리고, 새로운 협력의 기회를 만들 수 있는 네트워킹 공간이에요.
논문 기본 정보
- 자료유형
- 학술저널
- 저자정보
- 발행연도
- 2000.3
- 수록면
- 77 - 83 (7page)
이용수
초록· 키워드
Cost, time, and quality are the three major measures for the project performance. Among these three measures, cost control directly relates to the profit and competence of a construction company. However, it is conceived that current practice of cost control in major Korean general contractors needs to be improved in terms of its accuracy and procedure. The problems are mainly caused by the shortage of cost engineers on job sites. In this context, the purpose of this study is to identify major factors for improving construction cost control on job sites. A survey was conducted to investigate current cost management systems of 15 Korean general contractors. Barriers and solutions were explored in terms of improvement of cost control process under limited utilization of cost engineers. Findings of this study suggests; 1) Early budgeting, 2) Using higher level of items, 3) Simplifying progress measurement, 4) Systemizing cost forecast, and 5) Effectively utilizing computer systems.
상세정보 수정요청해당 페이지 내 제목·저자·목차·페이지정보가 잘못된 경우 알려주세요!
목차
등록된 정보가 없습니다.
참고문헌
참고문헌 신청최근 본 자료
UCI(KEPA) : I410-ECN-0101-2009-540-012965959