메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
The various typed management applied methods in construction are introduced, while specializing management methods of construction project. One of those is Design Management which has term interpreting problem. Design Management of Domestic Situation is to manage construction project for CMr at Design Process. But this paper is discussing Design And Management(D&M). D&M tied both Design Process And Construction Process into single contract, so D&M take process from design to building completion in one. Difference form Design Build is that manager is not a contractor but an agent. The problem which happens in the construction stage is solved in the design stage. So that could achieve reducing time and innovation of management through improvement of teamwork and communication. This paper analyzed the mind, the ability, the legal and systematic restriction, environment and society of D&M form of a designer and contractor of the domestic environment through indirect questionnaire and documentation investigation. This paper inquires availability of D&M.

목차

Abstract
1. 서론
2. 본론
3. 결론 및 제언
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-017421525