It is common case in construction that the general conditions of delays are stipulated in contract documents. The analysis method of construction delays, however, is not clearly mentioned in the construction contract. The type of construction delays can be classified into the. delay where one delay event occurs (independent delay) and the delay where two delay events occur simultaneously (concurrent delay). Previous researches for the concurrent delay have focused on the influence of the delays and the assignment of responsibility for the delays against the whole construction schedule just assuming the responsibility of each delay. Therefore, they could not challenge the whole process of concurrent delay analysis showing the responsibility of delay events. To solve this problem, this research proposed an improved construction delay analysis method utilizing the hierarchical planning process and the causal map of system thinking. A case study showed the proposed method to be improved in context of exactness and reasonableness to analyze the construction concurrent delay.

목차

Abstract
1. 서론
2. 공기지연의 유형 및 분석방법과 시스템사고 연구고찰
3. 동시발생 공기지연 분석방법
4. 사례를 적용한 분석방법의 검토
5. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-017421570