메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Lean construction is a way of creating wealth and eliminating waste across the industry. Improving flow reliability is a main principle in lean construction. While reducing variability and flexible capacity are complementary strategies of lean thinking. However, Efforts on utilizing lean thinking in construction have generated limited strategy for more reliable labor flows. This paper focuses on the labor flow management to improve labor flow reliability that will lead to better performance by using lean thinking. Flexible strategy as a tool of management using lean thinking contains numerical flexibility and functional flexibility. In this paper, the labor flow management, a mixture of numerical and functional flexibility, could make immediate respond to the changeable conditions and reduce the variability in construction. As a result, the strategy should improve the flow reliability to achieve the better productivity in construction.

목차

Abstract
1. 서론
2. 예비적 고찰
3. 노동력 흐름의 유연성 관리
4. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-017421707