The installation of rebar constitutes a major portion of framework of cast-in-placed concrete structure. Although reinforcing steel occupies a small portion of the volume of reinforced concrete structure work, its contribution to the cost is approximately equal to that of concrete. However, rebar work in the framework is done by hand at job site and it can lead to a decline of the construction productivity. Therefore, in this study, a work monitoring method called work sampling and crew balance study is proposed that to improve labor productivity of rebar work and present a new work sequences. In order to develop work methods, we observed a wall frame. As a result of this observation and analysis, rebar pre-fabrication method and revised work sequences is suggested to improve work efficiency. Using this observation data, not only improving work productivity, but also cost saving of concrete framework and shortening the work duration could be possible.

목차

Abstract
1. 서론
2. 예비적 고찰
3. 작업 분석
4. 개선 방안
5. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-017484382