메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
저널정보
대한건축학회 대한건축학회 논문집 - 계획계 大韓建築學會論文集 計劃系 第25卷 第6號
발행연도
2009.6
수록면
229 - 236 (8page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Recently the functions of public office building have changed into multi-purpose types, such as residential culture, welfare, lease and others as well as public administration services. This diversification of functions has brought the enlargement of the public office building and the increase of construction costs compared to the past.
Especially, the MEP(Mechanic, Electric, Plumbing) construction costs are expected to increase by the application of building automation system, intelligent system and energy saving system. the MEP costs of the public office building account for 33.94% of the total construction costs averagely. Therefore, the demand of an appropriate cost estimating and management has increased, the controversy about the reasonable costs of the public office building has been growing steadily. However, most of researches on cost estimating model for construction focused on the overall construction, frame work and finishing work.
This study suggests CBR(Case Based Reasoning) based MEP Cost Estimating Model which is estimating by selection of main works and impact factors. 16 Main works and 28 Impact factors were provided through analysis of the construction costs of 19 public office building projects. The proposed model will facilitate the estimating of MEP cost in the basic design stage by project owner or architect, and proves cost estimating accuracy of the Model for the case.

목차

Abstract
1. 서론
2. 기존 연구고찰
3. 공공청사 설비공사비 분석
4. 설비공사 공사비 산정 모델 구축
5. 결론
참고문헌

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2009-540-018484673