메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
이성호 (전북대학교)
저널정보
한국태양광발전학회 Current Photovoltaic Research Current Photovoltaic Research (CPVR) Vol.2 No.4
발행연도
2014.12
수록면
182 - 188 (7page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
For the dissemination of new and renewable energy, Korean government introduced a renewable portfolio standard (RPS) scheme in 2012 after terminating feed-in tariff (FIT) scheme that was introduced in 2004. With the RPS scheme, 64.7% of its own goal (95.7% in PV and 63.3% in non-PV) was achieved in 2012 and 67.2% of that (94.9% in PV, 65% in non-PV) was achieved in 2013. The deployment of PV systems met the goal very well and that of non-PV did not. Recently, Korean government revised the target year of supplying 10% electricity from new and renewable energy from 2022 to 2024 and released a couple of measures on PV area. Recent studies showed that the bankability of a project plays a key role for PV dissemination. Therefore, the dissemination should be assessed from the point of bankability under the RPS scheme and a little adjustment is necessary to achieve the goal. Especially, installing a small size PV (<100 kwp) system needs a minimum REC price or a FIT scheme. In non-PV area, permission process is a common bottleneck and the related regulation should be eased. In addition, to achieve the long term goal, an implementing scenario has to be prepared. Currently, the portion of the waste-gas energy originated from fossil fuel is too large among the new and renewable energy sources and the portion should be lowered or eliminated in the 10% of electricity supply goal. Seoul Metropolitan Government (SMG) has its own FIT scheme for PV dissemination from 2014 SMG and revised the PV tariff from 50 to 100 won/kwh in effective of 2015. It is worth to spread the other provinces.

목차

ABSTRACT
1. 서론
2. 재생에너지 일반 현황
3. FIT와 RPS 제도
4. 우리나라의 공급의무화제도 (RPS)
5. 최근(2014. 12. 8) 공급의무화 제도보완에 대한 평가
6. 우리나라 공급의무화제에 대한 추가 제안
7. 기타
References

참고문헌 (0)

참고문헌 신청

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2016-563-001888134