메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
남수철 (Korea Electric Power Coopertion) 구본길 (Korea Electric Power Coopertion) 한준 (Korea Electric Power Coopertion) 강성범 (Korea Electric Power Coopertion) 차승태 (Korea Electric Power Coopertion)
저널정보
대한전기학회 전기학회논문지 전기학회논문지 제72권 제2호
발행연도
2023.2
수록면
155 - 161 (7page)
DOI
10.5370/KIEE.2023.72.2.155

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

이 논문의 연구 히스토리 (2)

초록· 키워드

오류제보하기
The role of the power grid in the power system is to transmit the power produced at the power generation sites to the demand sites without interruption. When a new power source plan is established, a new power grid plan is also established so that necessary power grid construction is carried out at an appropriate time. However, the construction of a new power grid is not easy due to the problem of location selection and economic reasons. For this reason, efforts have been made for a long time to find ways to increase the capacity of the grid to avoid the construction of the new grid. A typical one of them is a method of increasing power transmission capacity by compensating the series capacitive impedance of the power transmission network. Therefore, KEPCO, in response to the delay in the construction of a new power grid for the construction of a large-scale power generation complex in the Yeongdong area, it was decided to increase the power transmission capacity of the existing power grid through series capacitive impedance. However, there is a risk that such an increase in transmission capacity through impedance compensation may cause problems such as sub synchronus resonance (SSR). In case of SSR, occured when the resonance frequency of the impedance-compensated power grid coincides with the mechanical resonance frequency of the nearby generator, and if a mechanical burden is accumulated on the generator shaft, the shaft may break. For this reason, the power authorities reviewed the risk of SSR and installed thyristor controlled series capacitor (TCSC) based on the results to avoid dangerous frequency bands by adjusting the apparent impedance of the impedance-compensated transmission line. In this way, the risk of SSR was responded to through sufficient preparation for impedance compensation. However, in the case of wild fires in Uljin and Samcheok, which occurred in March 2022, a number of transmission lines were opened, and the network topology between the compensation line and the nearby generator approached the condition of SSR, increasing the risk of resonance. This paper analyzes the risk of actual SSR based on the system configuration during wildfires in Uljin and Samcheok and the system operation information obtained through the Phase Measurement Unit (PMU) located nearby sites.

목차

Abstract
1. 서론
2. 본론
3. 결론