메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
신원상 (한국건설인정책연구원) 손창백 (세명대학교)
저널정보
대한건축학회 대한건축학회논문집 大韓建築學會論文集 第40卷 第12號(通卷 第434號)
발행연도
2024.12
수록면
287 - 294 (8page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
The purpose of this study is to analyze the level of work performance of CMr by project stage to derive work that lacks work performance capability, and to present practical improvement measures necessary for enhancing the capability of CMr and improving the management system for the successful execution of construction projects in the future. The results derived through this study are as follows. 1) The tasks in the design stage, such as implementation design and basic design with a large workload, generally have high work difficulty, high work burden index, and high work importance. 2) The work efficiency index of the implementation design stage and construction stage, where the current work performance level is low compared to the work importance level, and the difference between the current work performance level and the future work demand level also showed a big difference compared to other tasks. 3) The main factors that deteriorate CMr work performance are related to personal ability that affect their work performance ability, so it is urgently necessary to establish improvement measures for personal ability and competency in order to improve the CMr work performance ability. 4) In this study, based on the results of a survey of CM practitioners, improvement measures were proposed for factors such as lack of field experience and knowledge of CMr, lack of responsibility and authority for CM work operation, lack of individual capabilities of CMr, and lack of clear management standards and manuals. This study analyzed the level of work performance of CMr by construction project performance stage and suggested improvement measures to improve work performance.

목차

Abstract
1. 서론
2. CM인력의 업무수행수준 분석
3. CM인력의 업무수행능력 저하요인
4. CM인력의 업무수행능력 향상방안
5. 결론
REFERENCES

참고문헌 (12)

참고문헌 신청

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-151-25-02-091259432