메뉴 건너뛰기
소속 기관 / 학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
고객센터 ENG
주제분류

논문 기본 정보

저자정보
(Korea Electrical Safety Corporation) (Korea Electrical Safety Corporation) (Korea Electrical Safety Corporation) (Korea Electrical Safety Corporation)
저널정보
대한전기학회 전기학회논문지 전기학회논문지 제75권 제10호
오류 신고하기

피인용 0

검색

    초록·키워드

    Ensuring the safety of electric vehicle DC charging facilities requires not only verification of the conditions of installed facilities but also consideration of the verification scope for DC output-side insulation monitoring and fault-response protective functions. This study compares the verification objects and objectives across three distinct layers: facility safety inspections based on the Korea Electro-technical Code (KEC) and the Korea Electrical Safety Code (KESC), product safety verification based on KC 61851-23, and the self-diagnostic functions embedded in the charging system itself. The analysis is limited to System C, which corresponds to the DC Combo (CCS) fast-charging interface used in Korea. The proposed 2026 amendment to KC 61851-23 is treated separately as comparative material for identifying the direction of future technical requirements rather than as a currently effective legal basis.
    The analysis shows that facility-side earthing and insulation inspections differ in both verification object and purpose from DC output-side protective-conductor continuity monitoring and insulation-monitoring functions on the DC output side. It also confirms that the charging system independently performs insulation verification before charging and continuous insulation monitoring during operation. The fundamental requirements for insulation monitoring and protective actions are already included in the currently effective KC 61851-23, while the main differences introduced by the proposed amendment lie in terminology and the level of detail in the associated test procedures rather than in the underlying assessment principle.
    Accordingly, this study proposes a staged safety verification framework consisting of product safety verification, installation and field safety confirmation, utilization of operational diagnostic information, and conditional verification of protective functions. Prior to institutionalization, available diagnostic information is used as supplementary information for maintenance and technical diagnosis, while detailed verification through fault-state reproduction is performed only when clearly defined conditions arise, such as recurring safety-related anomalies or the repair or replacement of major protective components. Incorporation into statutory inspections should be considered only after field validation and standardization and only when the KESC and related public notices are amended accordingly. Because resistance values and response times differ in meaning and applicable conditions across standards, this study does not propose a single new acceptance criterion.

    최근 본 자료 전체보기