메뉴 건너뛰기
소속 기관 / 학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
고객센터 ENG
주제분류

논문 기본 정보

저자정보
출처
EDP Sciences SHS Web of Conferences 166
오류 신고하기
표지

검색

    초록·키워드

    Aiming at the shortcomings in current power equipment supplier evaluation, this paper is designed for different types of project comprehensive evaluation models. First of all, starting from the type of project and engineering needs, the indicator system was established in four aspects: qualification ability, process control, operation quality, and service quality. Then, the subjective weight and objective weight of each evaluation index were calculated by the fuzzy analytic hierarchy process (AHP) and factor analysis method. The final weight was obtained by a combination weighting method. The supplier category was determined according to the principle of maximum membership, and the final evaluation was completed. Finally, the evaluation model was verified by the distribution transformer supplier, and the results proved the objective rationality of the evaluation model.

    본문·목차

    최근 본 자료 전체보기