메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색

논문 기본 정보

자료유형
학술저널
저자정보
김승기 (홍익대학교 대학원) 장영호 (홍익대학교)
저널정보
한국공간디자인학회 한국공간디자인학회 논문집 한국공간디자인학회 논문집 제18권 제2호
발행연도
2023.3
수록면
39 - 52 (14page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색

초록· 키워드

오류제보하기
(Background and Purpose) There is a growing trend that local governments manage the entire process of public design even from making budget, by developing the assessment index to make it more effective. Therefore, this study put its purpose on suggesting measures to activate and develop public design for more effective projects, by seeing whether deliberation and consultation—that can be referred as a major role of Public Design Promotion Committee— function properly, and by analyzing current status of its management system, which is being processed under local governments. (Method) First, limited to the public participation projects of Gyeonggi-do, current state and problems of public design project were extracted in order to supplement its administration system, from the analysis on overall administration system and pertinent deliberation process and enactment results of the Committee. Second, a database that can be collected in the administrative field was used to understand the process of public design projects from an administrative perspective and to present practical applicable measures. Third, the problems of the administrative process were derived and alternatives were presented. (Results) Based on the analysis of each stage of the Gyeonggi-do public participation project, the problems and improvement plans identified through on-site analysis of whether the project was applied to the actual construction from the design to deliberation stage for assembling the project management system are as follows. First, local governments need to build infrastructure for public design as well as comprehensive and systematic instructions to manage the desultorily driven projects that are separately ordered according to construction types. Second, a standard for public design should be presented because of necessarily different results due to various factors, while forming a consultation group for implementation that can cooperate with civil experts to operate. Third, legal standards for general planners are needed. Fourth, organizational structure to secure design consistency from planning to construction stage was found to be very important as part of the policy to supplement the problems like the faults at the final stage, because the construction process may not follow the initial design. (Conclusions) Previously, studies on the administrative system and project evaluation related to public design have been conducted, but studies evaluating the comprehensive administrative system linking the initial stage of the project from budgeting to the construction stage are insufficient. Thus, this study is expected to be used as useful data in that the overall design administration process, which is currently recognized as a simple administrative task, can change the outcome of the project. Finally, it is hoped that this study can be used as basic data to establish an effective and systematic public design project management system through the results of various administrative procedures accompanying the public design project process.

목차

등록된 정보가 없습니다.

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

최근 본 자료

전체보기

댓글(0)

0